Skip to content
Capabilities

Engineering.Manufacturing.Execution.

Three disciplines. All in-house. One accountable partner from calculation to handover — no vendor stitching in between.

Engineering team
12
In-house structural + design
Manufacturing facility
80,000 sq.ft
Owned fabrication yard
Fabrication capacity
12,000+ MT/yr
Rolling annual output
Source · APT master record
01 / 03

Engineering

A 12-member in-house engineering team owns every project from structural design through detailing.

12
In-house engineers
  • Structural design & analysis
  • 3D detailing & shop drawings
  • BOQ & optimization
  • Buildability review
Advantage

Design-led, calculation-first, buildable from day one.

02 / 03

Manufacturing

A 80,000 sq. ft. owned fabrication facility with a rolling capacity of 12,000 tons/year. Every primary member is fabricated under one roof.

900 t/mo
In-house capacity
  • Owned 80,000 sq.ft facility
  • 12,000 t/yr rolling capacity
  • Auto welding & profile cutting
  • QA/QC through the line
Advantage

Fabrication under one roof, one QA regime, one accountability line.

03 / 03

Execution

From transport to erection to sign-off — one accountable partner. Delivered across India and internationally in Myanmar and Bhutan.

500+
Projects delivered
  • PAN-India site teams
  • International delivery
  • Safety-led erection
  • Turnkey handover
Advantage

PAN-India logistics, site teams, and turnkey handover.

The APT Method

Five owned stages.
Fewer handoffs.

One partner accountable from calculation to handover. Every stage under one roof, one QA regime, one programme.

01 / 05

Design

Structural design tuned to your loading, before a beam is cut.

02 / 05

Engineer

Detailing, calculations, shop drawings — all in-house.

03 / 05

Manufacture

Fabricated in our own 80,000 sq.ft facility.

04 / 05

Assemble

Bolt-up modular assembly by pre-briefed site teams.

05 / 05

Deliver

Turnkey handover against a locked programme.

One partner. Five owned stages. Fewer handoffs.

End-to-end · in-house · accountable
The Construction Shift

The old way is done in months.
Our way is done in a programme.

Five steps separate a conventional build from an engineered one. Aer Prefab owns all five.

01Design
Old way

Standard templates. Buildability worked out on site.

APT

In-house structural design tuned to your loading, from day one.

02Engineer
Old way

Split between architect, consultant, and fabricator.

APT

One engineering team owns calculations, detailing, and shop drawings.

03Manufacture
Old way

Multi-vendor fabrication with variable QA.

APT

Everything fabricated in our own 80,000 sq.ft facility, one QA regime.

04Assemble
Old way

Site welding. Weather-dependent schedule.

APT

Bolt-up modular assembly by pre-briefed erection teams.

05Deliver
Old way

Handover often slips against the schedule.

APT

Turnkey handover against a locked programme.

Numbers behind capability

The record we back it up with.

20+
Years of engineering
Founded 2006, Nagpur
500+
Projects delivered
Across industries & scales
42 Lakh+
Sq. ft. installed
Cumulative built-up area
10,000+
Tons of steel
Structural steel deployed
900 t/mo
Fabrication capacity
In-house facility
12,000 t/yr
Annual throughput
Rolling capacity
80,000 sq.ft
Facility footprint
Owned fabrication yard
12
Engineering team
In-house structural + design
Ready to talk buildings?

Tell us the site.
We'll tell you the schedule.

Share your programme — building type, area, location and timeline. An Aer Prefab engineer will respond with a preliminary assessment and schedule.

45, Central Ave, Near Satkar Hotel, Fawara Chowk, Gandhibagh, Nagpur, Maharashtra 440018