Little Nest School
9,000 sq.ft school shell — designed, fabricated, and handed over in 15 days.
A growing school needed a 9,000 sq.ft learning block ready for the next academic session — an impossible timeline for conventional construction.
A prefab structural system, engineered up-front and fabricated in parallel with foundations, so the shell erected as fast as it landed on site.
- 01
Design & structural detailing completed in-house against a fixed handover date
- 02
Primary members fabricated in-house under one QA regime
- 03
Foundations and superstructure sequenced in parallel
- 04
On-site erection team pre-briefed on every module before dispatch
- 01
Full 9,000 sq.ft shell handed over in 15 days
- 02
School opened on the target academic date
- 03
Finish quality of a conventional build at prefab speed
Tell us the site.
We'll tell you the schedule.
Share your programme — building type, area, location and timeline. An Aer Prefab engineer will respond with a preliminary assessment and schedule.
45, Central Ave, Near Satkar Hotel, Fawara Chowk, Gandhibagh, Nagpur, Maharashtra 440018